About

Showing posts with label News. Show all posts
Showing posts with label News. Show all posts

New 3D Print Technology for the Construction of Houses

A new 3D printer technology has been developed lately to allow the construction of a house by printing part by part of the building and putting them together.

There is a specific video where illustrates and explains the new technology by the developers, as well as showing the very first canal house constructed using this technology in Amsterdam.


The printer can print parts with dimensions of 2m x 2m x 3.5m and the material of the parts printed is mixture of bio-plastic with 75% of vegetable oil. The technology has the potential to reduce CO2 emissions due to the eco-friendly material used for the printer as well as the reduction of the production of concrete and other materials. 

In the small clip explains that this technology reduces the construction cost as there is no need for material transfer as the printer will be functioning in-situ.

Furthermore, there is a software that the developers of the technology are developing to allow people in general to design their own houses to make it more personal.

Could this new technology really bring a big benefit to the construction industry due to the materials and cost-reduction that provides? Or could the last point made be the end of Architect's need in the industry as people will be able to design their own houses?

Ecobuild Exhibition 2014 in London

Between the 4th and 6th of March the tenth Ecobuild Exhibition for 2014 will be hosted in ExCel centre in London, According to the Ecobuild official website the exhibition is the 'world's leading event for sustainable design, construction, energy and the built environment'



In the Exhibition you will find tons of different ideas for sustainable construction, materials to use for your project and many more, including softwares for 3D modelling.

I will not describe the exhibition in full as it would be best to visit it. To register for the exhibition go on the Ecobuild official website to register for a free badge on https://registration.n200.com/survey/2bh8akmvg5386?check=1



BIM DECODING

Normally there is only one post every week, but there is going to be a small exception to this rule that we have and make another post. The reason why I am doing this exception is because if i post this next week it is going to be already too late.

Yesterday I received an announcement on me e-mail about a lecture that will be taking place in London South Bank University regarding Building Information Modelling.

You would think that this is not as important as it sounds or that you are fed up attending to evening lectures that are not directly connected to your course etc., but that might change your mind when you learn that this lecture is actually committed by RIBA.




The fact that the lecture is sponsored by RIBA doesn't mean that it's the only reason for somebody to attend. Building Information Modelling is the new technology that professionals in the construction industry will be using for collaborating in a project with a lot of people. It is very important for students to get to know about BIM and learn to use it in their projects as it is going to be a highly required skill in the future.

The event will take place in Keyworth Centre Building at London South Bank University on the 5th of December at 19:30.

To register for attendance you need to send an e-mail at ribasouthlondonbranch@gmail.com
There is going to be an entrance fee of £5. Even though everyone would prefer to go for free, five pounds is not that much to spend.

Engineering & Construction Recruitment Exhibition 2013



The Engineering & Construction Recruitment Exhibition is going to take place in Birmingham in the 29th and 30th of November.

It is a great opportunity for students and  young professionals to break into the business as a lot of recruiters are going to be there.

For more information about the event visit: http://goo.gl/gnkWDm

You need to register (open an account) with https://www.engineerjobs.co.uk/ and you are going to receive a registration code through e-mail, make sure you save it as they are going to require that in the entrance.

Venue Adress:

Hall 11
National Exhibition Centre
Birmingham
B40 1NT


The CITA BIM Gathering



This is especially for the viewers from Ireland! (Or whoever can travel to Ireland for the specific event)

I received an invite from the CITA BIM Group from twitter regarding the event they are hosting of an integrated 2 day BIM Conference Leveraging Building Information Modelling to Create Cultural and Lean Transformation of the AEC Sector as part of the Irish Government's 2013 Gathering Initiative on the 14th and the 15th of November


For more information regarding the gathering and how you can register if you are interested to attend visit their website: http://gathering.cita.ie



London Development: The Pinnacle

The Pinnacle, or else called The Bishopsgate Tower, is a brand new development in central London and its construction continues until today, more specifically it's currently on hold. The architect of the project is Kohn Pedersen Fox and the developer is Real Estate AG, which is a fund management company.


It is located at 22-24 Bishopsgate in London (closest tube station: Aldgate). Its construction started in 2008 but since March 2012 it has been on hold to the point where only the concrete core of the first seven floors is completed, there is still a long way to go if you ask me, considering there will be 64 floors for this building.

Even though it is unknown when the construction of the building is going to be complete, The Pinnacle will be the tallest building in the area of Central London and the second tallest building in the UK and the EU with a height of 288 metres (tallest building will still be the London Shard with height of 310 metres).

Comparison of the high-rise buildings of London (From tallest to shortest)
As referred above, the Pinnacle is currently on hold. That is because of lack of additional funding and letting commitments. The current state of the building leaves its future in doubt and the project will be re-designed.

The names of the building kept changing from time to time. The original name of it is 'The Bishopsgate Tower', then they nicknamed the building to 'The Helter Sketler' because of its twisting design of its roof and the curling patterns in the façade. The building was later renamed to 'The Pinnacle' because in 2007 it was confirmed that it has been purchased Arab Investments

EC Harris Employment Event

On Tuesday, 8th of October there is going to be an event lecture taking place in London about construction careers for graduates. 

From this year EC Harris Employment started employing a lot of students who graduated with an Architectural Technology degree giving them an opportunity to get into the construction industry.

Kerry Snodden, Graduate Recruitment Coordinator for EC Harris, and Alex Roffery, will outline their Graduate, Year Out and Summer Placement Schemes, as well as providing guidance on the application and recruitment process.

The event will take place at London South Bank University, VG06, K2, Keyworth str., SE1 London.



It is a great opportunity for graduates and students who are looking for internship, like myself.

To attend the event you need to register online from the link provided below.
https://echarrisevent.eventbrite.co.uk/

The Technical Mistake of Walkie Talkie Building.

Walkie Talkie is a new 37-storey skyscraper recently erected, yet to be completed in a year in London (specifically at 20 Fenchurch Street) with lightweight glass cladding.


The problem about this building is that the glass used for the façade is highly reflective to the point that some describe it as a magnifying glass above ants.

Even though a lot of people could predict this hazard - one of them a CGI artist - it is recently that this technical problem was taken in account where the reflection of the sun from the building literally melted a car. (Check out article in the link: http://goo.gl/1i26Ml)

The architect of this building admits that he realised that the cladding would cause problems by reflecting the sun, but he also admits that he didn't realise it would be that hot. "We made a lot of mistake with this building and we will take care of it", he said.



To solve this hazard, the owners erect a temporary scaffold shield to protect the street from the heat waves reflected. This will keep the streets from heating up for the next two or three weeks, after that the phenomenon is expected to disappear, however, the engineer's job does not end here, they are still continuing the evaluation for long-term solution to prevent this issue from happening in the future.

For this technical mistake the building gains a nickname and from Walkie Talkie, now is being called the Walkie Scorchie.

Building Information Modelling Protocol (Feb 2013)

Construction Industry Council (CIC) has published in February of 2013 the BIM protocol which refers to rules and laws regarding Building Information Modelling.



According to AT Magazine, the Government Construction Strategy gave a command that for all government construction projects will be used Level 2 BIM*. 

*According to out-law.com Level 2 BIM is A managed 3D environment held in separate discipline 'BIM' tools with data attached. Commercial data will be managed by enterprise resource planning software and integrated by proprietary interfaces or bespoke middleware. This level of BIM may utilise 4D construction sequencing and/or 5D cost information.

In the words of Simon Rawlinson (Chair of the Legal, Contracts and Insurance Working Group of the BIM Task Group and CIC Executive Board Member):

'CIC's suite of documentation represents a major step forward for the implementation of BIM in the UK. The Protocol provides a generally applicable contractual framework for the use of BIM on projects, representing the interests of the employer and model originators. We have also taken steps to define the scope of the role of Information Management and have addressed some common concerns in connection with the insurance industry. From my perspective, the great step forward has been to unify these documents around PAS 1192-2 and the information flows that are crucial to the BIM value proposition. I would like to congratulate the team for their excellent work in bringing the suite together.'

The protocol can be downloaded from the official website of the Construction Industry Council (http://cic.org.uk/publications/).

Several Changes on Building Regulations in England (2013)

According to the AT magazine, a magazine exclusively for the subject of Architectural Technology, in April and July of 2013 there have been the latest changes in the Building Regulations, intending to reduce the burden of regulation in the construction industry, and includes changes to Parts B, K, M and P.

The changes to the Approved Documents to Part B and M are minor, however the changes for the Approved Documents Parts K and P and to Regulation 7 are extent enough to the point that they require new editions of the documents. Approved Documents K, P and Regulation 7 are completely re-written to  conform to English standards only, to improve readability and remove duplicate information.

Even thought the Approved Documents are simplified there is a downside to this change. Each document is divided in three types of buildings: Buildings other than dwelling and common access areas in buildings that contain flats and do not have passenger lifts, Building other than dwellings and Dwellings. This is a downside as all the regulations have to be read carefully to determine which is for what type of buildings.



Part B:

Approved Document B Volume 2: Buildings other than dwelling houses' has two minor changes in the guidance to Requirement B2 Internal fire spread:

-A new footnote to Table 10 permits decorative wall coverings which achieve European Class C-s3,d2 to be used in circulation spaces, provided they are bonded to Class A2-s3,d2 substrates, The change is intended is to remove a barrier to the adoption of the European classification systems.

-The limitations on the use of type TP(b) thermoplastic diffuses and roof lights have been relaxed to allow smaller units to be used closer together: the revised limits are in table 11 and diagram 27A. It is anticipated that will facilitate energy efficiency lighting layouts.

Part K:

Part K and N are addressed to protection against falling, collision and impact with glazing, while in Part M (Access to and use of Buildings) is referring to some of the same issues, however with conflicting guidance. In the new updated version they avoid the repetitive information by transposing all the Requirements from Part N into Part K and avoiding the overlapping guidance from Part M.

This table illustrates the structure of Part K, together with the previous location of the Requirements.
The new Approved Document is not intended to provide new technical requirements, but only some minor changes in the guidance.

-Stairs are now defined as:
Private: intended to be used only for one dwelling.
General access: the normal route between levels for all building users. 
Utility: used for escape, maintenance or other purposes, but not as a normal route

-The guidance on rise and going has been simplified and, as a result, there are difference in allowable dimensions.

-Approved Document K now contains minimum stair widths for buildings other than dwellings, of 1200 mm between enclosing walls or upstands, and 1000 mm between handrails.

-References to standards have been updated, so, for example, loading on guarding is now circulated to BS EN 1991-1-1 (with UK National Annex) and BD 6688-1-1.

Part M:

The most significant change that was made for Part M is referred mainly to Access Statements for building control purposes.

The Building Control Bodies (BCB) did not find Access Statements very useful, and the preparation of Access Statements did not sit easily the design process, therefore it has been abolished. Instead the applicants must communicate the access strategy, which means BCB requires to receive the strategy clearly how the approach chosen for the project demonstrates compliance with Part M.

The access strategy should focus on points where they drift apart from the Approved Document. For smaller project it can also be suggested to have a conversation to review the proposals and record the outcome by correspondence. For larger works it may be required to be provided with written documents accompanied by annotated drawings.

Part P:

The intention of this part is to reduce the number of injuries and fatalities caused by poor quality electrical installation work in dwellings. Part P has been introduced since 2005 which improved the electrical safety, but there have been concerns that the range of notifiable work is too extensive and the cost of inspection for unregistered installers is too high. In these issues is where the changes are focused.

All electrical installations in dwellings should be carried out to BS 7671 (incorporating amendment 1:20011), but only the following work is notifiable:


  • Installation of a new circuit
  • Replacement of consumer unit
  • Addition or alternation to existing circuits
Where work is notifiable, a registered competent person can self-certify the wok. Non-registered installeds can either have the Building Control Body certify the work, or they can arrange for third party certification by a registered third-arty certifier, which should be more cost effective.

Regulation 7:

Regulation 7 mainly addresses the suitability of materials and standards of workmanship. The most significant change is in the acceptable methods for demonstrating a material or product's fitness for purpose:

  • CE marking under the CPR to a harmonised European Standard or European Technical Approval.
  • CE making under other European legislation, such as the Gas Appliances Directive.
  • Assessment to a British Standard or to another national or international technical standard
  • Independent certification schemes
  • Tests and calculations
  • Past experience
These markings will make it easier for designers to demonstrate the suitability of a product. The changes to Approved Document 7 also require corresponding changes to the guidance on materials and workmanship, independent certification schemes and technical specifications in all other Approved Documents (A,C, D, E, F, G, H, J and L)

The Italian fonts indicate the changes that have been made to the Approved Documents.